『Production License for Flow Meter Shell』Related information(v cone flow meter|rotary gas meter|gallon meter|gear meter|metal tube rotameter|glass tube rotameter|nutating disk meter|transit time ultrasonic flow meter|wedge flow meter|pd meters|hydraulic flow meter|ultrasonic water flow meter|water flow meter|air flow meter|magnetic water flow meter|oxygen flow meter|gas flow meter|argon flow meter|air velocity meter|gasoline flow meter|fuel flow meter|ultrasonic water meter|digital water meter|nitrogen flow meter|solid flow meter|Oxygen tank flow meter|digital water flow meter|diesel fuel flow meter|steam flow meter|02 flow meter|compressed air flow meter|oil flow meter|liquid flow meter)

What is the process of supervising and inspecting the certificate of special equipment for flowmeter casing (manufacturing of pressure pipeline components)? _Baidu Knowledge ..
Supervision and inspection key verification certificate information negotiation process
1. Basic unchanged data 1 Warranty Manual 2 Program file 3 Homework guidebook 4 Appointment Letter 5 Welder Certificate 6 Non destructive testing personnel certificate 7 Welding process evaluation (by material)
2. Data needs to be organized 8 Sales Contract Signed with Customers 9 Work Order Production Order 10 Purchase of Steel Pipe Flanges Contract 11 Notice of Delivery and Inspection of Items 12 Item Acceptance and Storage Form 13 Material Re inspection Record Form, Material Acceptance Record 14 Original Material Quality Certificate+(requires supplier seal and signature)
III. Design Documents 15 Design Drawing 16 Shell strength calculation sheet 17 Assembly, appearance, and dimensional inspection records 18 Process documents for flowmeter housing
IV. Inspection and testing 19 Non destructive testing report (Mr. Xie) 20 Hydrostatic test report (personally reviewed by Teacher Shi) 21 Inspection Report 22 Design of flowmeter nameplate 23 Supervision batch name, factory number, and parameters 24 Pipeline Component Inspection Record Form 25 Stainless steel material requires: PMI is a handheld chemical analysis (third-party)
2. What is the supervision and inspection certificate for special equipment of flowmeter housing (manufacturing of pressure pipeline components) process? _Baidu Knowledge
The application process for supervision and inspection certificates includes the following steps
1. Prepare basic mate

2. Organize relevant materials: such as sales contracts signed with customers, production work orders, contracts for purchasing steel pipes and flanges, goods arrival and inspection notices, goods acceptance and warehousing forms, material re inspection records, and material acceptance records.
. At the same time, it is necessary to provide material quality certificates for the original socks, and ensure that the suppliers official seal and signature are complete. 3. Prepare design documents, including design drawings, shell strength calculation sheets, assembly, appearance and size inspection records, and flowmeter shell process documents. 4. Complete inspection and testing: submit non-destructive testing reports, hydrostatic testing reports, and inspection reports. Design a nameplate for the flowmeter and record the name of the inspection batch, factory number, and parameters. For stainless steel materials, a handheld chemical analysis (third-party) PMI report is also required. Please note that the allocation of responsibilities mentioned in the above steps may need to be adjusted according to the actual situation to ensure that each responsible person is clear about their tasks. In addition, all documents and reports should be completed and submitted within the specified time to meet the requirements of supervision and inspection.
Current position > Product detail